skip to main
|
skip to sidebar
Saturday, May 26, 2007
Site Preparation
This site has been cleared for construction of an apartment block to begin. Site office and facilities have been set up on one side of the site. A concrete perimeter has been poured. Post tensioning cords are laid to one side.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Vicstar
Blog Archive
▼
2007
(50)
▼
May
(29)
The Semester in Review
Roofing material for assignment
Major Assignment Model and Poster
Article Review
Assignment Drawings
Concrete Finishes 8
Concrete Finishes 7
Concrete finishes 6
Timber Portal Frame
Cutting Plan for Model
Band Beam and Slab
On-site research for Assignment (cantilevered conr...
On-site research for Assignment (column reo)
On-site research for Assignment (concrete floor co...
On-site research for Assignment (concrete column c...
Preliminary Research for Assignment
Concrete finishes 5
Article Review
Post tension concrete rods.
In situ concrete panels
Connection of roof bracing to steel beam
Curved steel portal frame
Site Preparation
Pumping concrete
Concrete finishe 4
Concrete finishes 3
Concrete finishes 2
Showroom/Office Plan
New Glass Viewing Platform at Level 88 Eureka Tower
►
April
(15)
►
March
(6)
About Me
Vicki
View my complete profile
No comments:
Post a Comment