This drawing shows how concrete and steel work together to create a flooring system that has a number of advantages. Bondek sheeting is laid over steel beams. Concrete is poured over the sheeting. The addition of sheer bolts increases the spanning capacity of the beam.
This type of flooring eliminates the need for temporary formwork. Construction is able to continue on the slab while before it is fully cured. This minimises delays in the construction process.