skip to main | skip to sidebar

Saturday, May 26, 2007

In situ concrete panels


Concrete wall panels were formed on site. Photo shows panels poured on top of each other. Reinforcement shown. Tench chairs can be seen.
Posted by Vicki at 6:14 PM

1 comment:

Unknown said...

For pictures of rapid concrete home construction using aluminum formwork visit http://picasaweb.google.com/ConcreteForming

May 15, 2008 at 6:04 AM

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Vicstar

Blog Archive

  • ▼  2007 (50)
    • ▼  May (29)
      • The Semester in Review
      • Roofing material for assignment
      • Major Assignment Model and Poster
      • Article Review
      • Assignment Drawings
      • Concrete Finishes 8
      • Concrete Finishes 7
      • Concrete finishes 6
      • Timber Portal Frame
      • Cutting Plan for Model
      • Band Beam and Slab
      • On-site research for Assignment (cantilevered conr...
      • On-site research for Assignment (column reo)
      • On-site research for Assignment (concrete floor co...
      • On-site research for Assignment (concrete column c...
      • Preliminary Research for Assignment
      • Concrete finishes 5
      • Article Review
      • Post tension concrete rods.
      • In situ concrete panels
      • Connection of roof bracing to steel beam
      • Curved steel portal frame
      • Site Preparation
      • Pumping concrete
      • Concrete finishe 4
      • Concrete finishes 3
      • Concrete finishes 2
      • Showroom/Office Plan
      • New Glass Viewing Platform at Level 88 Eureka Tower
    • ►  April (15)
    • ►  March (6)

About Me

Vicki
View my complete profile