skip to main | skip to sidebar

Sunday, May 27, 2007

On-site research for Assignment (column reo)




Reo for columns is designed by engineers. Shop drawings are done and column reo is made up off site. When it is required for construction it is lifted on site by a crane.
Posted by Vicki at 10:59 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Vicstar

Blog Archive

  • ▼  2007 (50)
    • ▼  May (29)
      • The Semester in Review
      • Roofing material for assignment
      • Major Assignment Model and Poster
      • Article Review
      • Assignment Drawings
      • Concrete Finishes 8
      • Concrete Finishes 7
      • Concrete finishes 6
      • Timber Portal Frame
      • Cutting Plan for Model
      • Band Beam and Slab
      • On-site research for Assignment (cantilevered conr...
      • On-site research for Assignment (column reo)
      • On-site research for Assignment (concrete floor co...
      • On-site research for Assignment (concrete column c...
      • Preliminary Research for Assignment
      • Concrete finishes 5
      • Article Review
      • Post tension concrete rods.
      • In situ concrete panels
      • Connection of roof bracing to steel beam
      • Curved steel portal frame
      • Site Preparation
      • Pumping concrete
      • Concrete finishe 4
      • Concrete finishes 3
      • Concrete finishes 2
      • Showroom/Office Plan
      • New Glass Viewing Platform at Level 88 Eureka Tower
    • ►  April (15)
    • ►  March (6)

About Me

Vicki
View my complete profile