skip to main | skip to sidebar

Saturday, May 26, 2007

Site Preparation


This site has been cleared for construction of an apartment block to begin. Site office and facilities have been set up on one side of the site. A concrete perimeter has been poured. Post tensioning cords are laid to one side.
Posted by Vicki at 5:52 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Vicstar

Blog Archive

  • ▼  2007 (50)
    • ▼  May (29)
      • The Semester in Review
      • Roofing material for assignment
      • Major Assignment Model and Poster
      • Article Review
      • Assignment Drawings
      • Concrete Finishes 8
      • Concrete Finishes 7
      • Concrete finishes 6
      • Timber Portal Frame
      • Cutting Plan for Model
      • Band Beam and Slab
      • On-site research for Assignment (cantilevered conr...
      • On-site research for Assignment (column reo)
      • On-site research for Assignment (concrete floor co...
      • On-site research for Assignment (concrete column c...
      • Preliminary Research for Assignment
      • Concrete finishes 5
      • Article Review
      • Post tension concrete rods.
      • In situ concrete panels
      • Connection of roof bracing to steel beam
      • Curved steel portal frame
      • Site Preparation
      • Pumping concrete
      • Concrete finishe 4
      • Concrete finishes 3
      • Concrete finishes 2
      • Showroom/Office Plan
      • New Glass Viewing Platform at Level 88 Eureka Tower
    • ►  April (15)
    • ►  March (6)

About Me

Vicki
View my complete profile